|
|
|
|
|
|
|
|
- (1)
- (1)
- (1)
- (1)
- (1)
- (1)
- (1)
- (1)
- (1)
|
|
|
|
|
HANTU is a role in a project of hydroelectric power:
Inspector: site inspection and study Designer : hydro power plant design. Revolutionlist: renovation for old hydro power mill Manufacturer: hydroelectric equipemts like hydraulic turbine, generator, adjustor, trrash rack. Instructor: installation, operation, and mantainance guidance. Supplier: compelte ancillary equipment and accessories for old plant mantaince. HANTU's service:
For New Hydro Power plants: - Site survey & design - Complete E & M equipments supply and related services - Erection and Commissioning - Plant management and maintance ( Ranging from trash defender, hoist and gate of water in-take to penstock, main powerhouse equipments and auxiliaries, first and secondary electrical equipments, then to substation, transmission line, even distribution station.) For Old Hydro Power Mills: - ***re parts supply - Technical imporving and equipments updating - Running a Hydropower Hospital (serving the market with design consultancy,problem diagnosing, trouble-shooting, ***re parts supplying, repairing and replacing, etc.)
HANTU's capacity
¡ñPower: 50kw~200Mw ¡ñFrequency: 50hz or 60hz ¡ñOutput Type: AC three phase ¡ñOutput voltage:400V, 3.3KV, 6.3KV, 10.5KV, or 13.8KV ¡ñWorking Water head: - For Francis turbine 20~500m - For Pelton turbine 40-1700m - For Kaplan turbine 2~70m - For Tubular turbine 1~40m
- For Turgo turbine 40-250m
¡ñWarranty period: 1 year(or more) ¡ñLife***n: 30~50years
|
Company: |
Chongqing Hantu Machinery & Equipment Co., Ltd
|
Contact: |
Hydro Power |
Address: |
1#, Jianxin West road, Jianbei, Chongqing |
Postcode: |
400000 |
Tel: |
8613983139805 |
Fax: |
86 23 22222222 |
E-mail: |
|
|
|